wiki:ComputeStartSetup

Version 7 (modified by george, 16 years ago) (diff)

--

MCF Installation Guide

Setting up MCF consists of two steps:

  1. Setting up ​MOLGENIS (follow instructions of the ​Molgenis Guide)
  2. Setting up ​GridGain
  3. Setting up MCF back-end. The automated installation of the default ​MCF Compute Manager will be available soon. To set up it now:

3.1. The ​MCF Compute Manager source code can be downloaded ​here
3.2. The source code should adjusted depending on analysis defined in ​MOLGENIS and hardware to be used in the system (follow explanations in the ​code examples section or contact ​George Byelas for assistance)

​Back to the main page