Changes between Version 14 and Version 15 of MolgenisScrum/Sprint11.12


Ignore:
Timestamp:
2011-03-25T13:32:49+01:00 (13 years ago)
Author:
Erik Roos
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • MolgenisScrum/Sprint11.12

    v14 v15  
    2323* The stories in Robert's team were not well integrated, lots of loose stuff.
    2424* The Sprint was too short with only 12 effective days. The next Sprint will be 4 weeks instead of 3.
    25 * Roan: mark a check out task with the owner(s) and the check-out date. Then you can see how long it stays on the board. If it's there too long, it's probably too big or there are blockers.
     25* Roan: mark a checked out task with the owner(s) and the check-out date. Then you can see how long it stays on the board. If it's there too long, it's probably too big or there are blockers.
    2626* Tasks should be small (max. 2 SP), so the burndown graph will go down more evenly.
    2727* You should know beforehand which team member can and will do which task (no surprises on the Scrum board).
    28 * Roan's demo was cut short because we were kicked out at 16.30 pm.
     28* Roan's demo was cut short because we were kicked out of the POB room at 16.30 pm. This has been taken into account for the next booking of the POB room.
    2929* There was too much in-depth discussion during the demo, so we lost time.
    3030* The presentation had become a mess, with slides moved and even deleted.
    31 * Alot time in accordance with team size.
     31* Tip: alot time in accordance with team size.
    3232* The first two teams didn't have "team spirit" in their presentations. You could start like: "We're team X and we've done Y story points, achieving stories A, B and C."
    33 * The first two teams didn't demo anything! This is really bad in Scrum. It's Demo Day, so don't show screenshots or code! Show working stuff and a link to the manual. George's screenshots were OK for practical reasons.
     33* The first two teams didn't demo anything! This is really bad in Scrum. It's '''Demo''' Day, so don't show screenshots or code! Show working stuff and a link to the manual. George's screenshots were OK for practical reasons.
    3434== User story suggestions from end-of-sprint demo's ==
    3535Please add or edit; we will put these in trac before sprint on Monday.